FeaturesPricing
LearningCommunity
Loading...
Energy & Utilities

Reliability ThroughTraceability

Connect grid requirements to equipment. Analyze failure modes in generation, transmission, and distribution. Maintain reliability with documented evidence.

Grid Reliability Requires Visibility

From generation to meter, every component matters. Requirements tell you what must work. FMEA tells you what can fail. Together, they keep the lights on.

Grid Reliability

Cascading failures cause widespread outages. Root cause hard to trace.

NirmIQ links systems to requirements. FMEA identifies cascade risks before failures.

Renewable Integration

New technology, new failure modes. How do you assess risk?

FMEA methodology works for solar, wind, and storage. Document and learn.

Regulatory Audits

NERC CIP audit coming. Documentation scattered across systems.

Requirements linked to evidence. Generate compliance reports on demand.

What We Provide Today

Honest about what's ready, what's partial, and what's coming

Requirements Traceability

Ready

Link regulatory requirements to operational systems

Infrastructure FMEA

Ready

Analyze failure modes in generation, transmission, and distribution

Safety Case Documentation

Ready

Document safety requirements with audit trail

Complete Audit Trail

Ready

Track every change for regulatory compliance

RPN Tracking

Ready

Risk Priority Numbers for equipment failures

NERC CIP Mapping

Partial

Map requirements to NERC CIP standards

Built for Energy Operations

The fundamentals energy companies need

Grid Reliability Requirements

Track reliability standards from NERC to equipment specs. When regulations change, see affected systems instantly.

Generation FMEA

Analyze failure modes in turbines, solar arrays, and storage systems. Document mitigations and track effectiveness.

Transmission & Distribution

Requirements traceability from substations to meters. Link maintenance procedures to failure mode analysis.

Compliance Evidence

Generate audit-ready documentation for NERC, FERC, and state regulators. Every decision documented with rationale.

Who NirmIQ Works Best For

Great Fit

  • Utilities and IPPs - Track generation, transmission, and distribution requirements
  • Renewable developers - Document solar, wind, and storage project requirements
  • Grid operators - Manage reliability requirements and compliance

Wait For

  • SCADA integration - Real-time data linking on roadmap
  • NERC CIP templates - Pre-built compliance frameworks coming
  • Asset management sync - Integration with Maximo, SAP PM planned

Ready to Strengthen Grid Reliability?

Start documenting infrastructure requirements and risks today. Build the evidence trail that keeps the grid running.